Case 1 - Bromine Extraction Overhead Piping

  • 24"-2" Seamless Piping System
  • 100 Mil FEP Thermoplastic Liner
  • Alternative Material: Titanium
  • +2 PSIG/Full Vacuum @ 230 degrees F
  • Shop Fabricated
  • Minimally Flanged Design
  • Field Installation Assistance
  • Thermal Stress Analysis
  • Orange Color Code

Case 2 - Sulfuric Acid Sewer System

  • Engineering, Manufacturing, Installation Package
  • Partial Underground Installation
  • 2500Õ Of 16" And 8" Piping Installed Including 4Õ Teflon Lined MW
  • Zero Lost Work Time
  • Minimally Flanged Design

Case 3 - Installation of FRP Crossover

  • Manufacturing and Full Mechanical Install of 2(ea) 6Õ FRP Crossover Elbows
  • Updated FRP Corporate Composite Specifications
  • Manufacturing Time: 6 weeks
  • Installation Time: 4 days


Click to enlarge images

NMR Case History 1 Picture

NMR Case History 2 Picture

NMR Case History 3 Picture

NMR Case History 3 Picture

© Non Metallic Resources, Inc.   •   Contact   •   Specifications   •   Useful Links   •   Site Map