Case Histories
Case 1 - Bromine Extraction Overhead Piping
- 24"-2" Seamless Piping System
- 100 Mil FEP Thermoplastic Liner
- Alternative Material: Titanium
- +2 PSIG/Full Vacuum @ 230 degrees F
- Shop Fabricated
- Minimally Flanged Design
- Field Installation Assistance
- Thermal Stress Analysis
- Orange Color Code
Case 2 - Sulfuric Acid Sewer System
- Engineering, Manufacturing, Installation Package
- Partial Underground Installation
- 2500Õ Of 16" And 8" Piping Installed Including 4Õ Teflon Lined MW
- Zero Lost Work Time
- Minimally Flanged Design
Case 3 - Installation of FRP Crossover
- Manufacturing and Full Mechanical Install of 2(ea) 6Õ FRP Crossover Elbows
- Updated FRP Corporate Composite Specifications
- Manufacturing Time: 6 weeks
- Installation Time: 4 days
|
|
|
 |